Audette Garage
Vintage Porsches
356's & Early 911's

1960 356B Super 90 Roadster


Undercarriage 100% Restored

The topside restoration of 88205 was completed three years ago and it has been driven extensively since. But the undercarriage was in mostly original condition and was long overdue for refurbishing. It turned into a two month project with the majority of the work being done by the talented Thomas Robertson of Audette Garage. We're posting a list here of the work done to help others who are comptemplating a similar project.

Undercarriage Scraped & Cleaned

  • Seam Sealer Applied
  • Undercoating Applied

Powder Coated the Following:

  • sway bar & mounts
  • camber compensator
  • spring plates & spring plate covers
  • tie rods
  • backing plates
  • rear axle oil seal covers
  • bump stop mounts
  • hand brake mechanicals

Brake System Rebuilt

  • master cylinder rebuilt
  • wheel cylinders rebuilt
  • drums turned
  • new brake shoes installed
  • stainless steel brake hoses installed

Suspension Rebuilt

  • new link pins installed
  • new king pins installed
  • all rubber bushings replaced
  • camber compensator asembly rebuilt
  • new Koni's installed
  • T6 trailing arm covers & bushings installed
  • alignment done

Transmission Rebuilt

  • rebuilt by German Transaxle in Bend, Oregon:
    • replaced cracked differential housing
    • replaced worn ring & pinion gears (with gears purchased from the auction at Harry Pellow's old shop)
    • replaced seals
    • refinished case
  • new transmission mounts installed
  • new starter bushing installed

Steering Rebuilt

  • steering box cleaned, new seals installed
  • new coupler installed
  • rebuilt original tie rods with fittings
  • new bushings installed
  • new shaft bearings installed
  • new steering damper installed

Shift Linkage Rebuilt

  • bushings in shift housing replaced
  • shift arm bushing replaced
  • installed new inner & outer boots

Heating System Rebuilt

  • NOS J tubes & flapper boxes installed
  • heating rods & cables hooked up
  • "straws", grommets and booties replaced
  • new heater hoses with correct clamps installed

Miscellaneous

  • horns rebuilt & refinished
  • parking lights grounded
  • electrical connections cleaned and correct color wiring installed
  • billet sump plate from Maine Custom by Design installed
  • new tach cable installed
  • new cable hangers installed
  • muffler painted with VHT paint
  • new throttle linkage bellcrank on transmission installed
  • new motor mounts installed
  • correct & original fasteners used everywhere (for example: 8mm/14mm ATF used for bumpers)
  • Redline 90wt. in transmission
  • Castrol GTX 20-50 in engine

Now that the project is complete the Mouse is nearing a concours level. But it will continue to be driven frequently, as was intended. Just too much fun to leave in the garage.

Click on Thumbnail for Large Picture


We welcome input & comments.

Return to '60 Super 90 Roadster Home Page
Return to Audette Garage Home Page